Planning guide

Load assessments

A load assessment helps decide what the backup power system should actually support. It keeps the conversation focused on the homeowner's priorities instead of guessing from square footage alone.

Alt-Gen Solutions is currently updating this photo.
Planning statA 13,000 starting-watt class generator still needs load selection because starting watts and running watts are different limits.Alt-Gen 13kW comparison sheet and generator planning notes.

The question is not just generator size

A load assessment asks what matters most: food storage, lights, internet, phones, medical devices, well pumps, selected comfort equipment or business equipment. Different loads behave differently, and some equipment needs more power to start than it needs to keep running.

That is why the assessment is useful even when the generator size sounds large. A 13,000 starting-watt class generator can support many selected loads, but it still has limits. The system recommendation should match starting watts, running watts, fuel type, panel conditions and the homeowner's real priorities.

Why this prevents disappointment

Without an assessment, people often assume whole home means everything can run at the same time. In real life, backup power is usually about choosing what matters most and avoiding overload. The assessment makes those tradeoffs visible before money is spent.

The same thinking applies to a food truck, RV or small business. A refrigerator, freezer, pump, warmer or air conditioner may have different startup needs. A good recommendation starts with the equipment list, not a generic promise.

A real-world example

A food truck operator wants to use the generator for events and storm backup. The assessment separates must-run loads from nice-to-have loads so the same system can be planned for business use and selected home backup.

Good fit when

  • Improves recommendation quality
  • Reduces overbuying risk
  • Clarifies realistic outage priorities

Tradeoffs to know

  • Requires accurate homeowner input
  • May reveal some loads need a larger plan
  • Final scope still needs panel review

Sources